Instructions
Surface treatment: The wall should be dry, flat, firm and free of oil and dirt, with a moisture content of less than 10% and a pH value of less than 10.
New cement wall
(1) New concrete needs 30 days to dry.
(2) Remove loose materials and crystallized salts.
(3) Fill cracks and holes with appropriate fillers.
(4) Apply a coat of optimized strong real stone paint primer.
Exterior wall putty
(1) After the putty is completely dry, use fine sandpaper to smooth it and remove the powder.
(2) The putty should be strong, water-resistant and crack-resistant.
Molded surface
(1) Rinse with a high-pressure water gun.
(2) Dilute household bleach at a ratio of 1:10 and wash the wall. After it dries for 24 to 48 hours, rinse it with clean water. After it is dry, apply a coat of optimized strong real stone paint primer.
Technical Parameters
Ingredients: Specially formulated acrylic copolymer, pigments, fillers, additives, and water.
Gloss: Matte.
Theoretical Coverage: Approximately 8 m2/kg (one coat).
Drying Time: Surface Dry: Approximately 1 hour (at 23°C and 50% relative humidity). Hard Dry: 2 hours (at 23°C and 50% relative humidity).
Recoat Time: 4 hours (at 23°C and 50% relative humidity). Water Washability: Good.
Volume Solids: Approximately 39%.
Specific Gravity: Approximately 1.4.
Durability: Excellent.
Construction Instructions
(1) Read the instructions before use.
(2) Stir the can after opening it.
(3) Add the appropriate amount of water according to the instructions, do not over-dilute, and stir thoroughly.
(4) Avoid excessive paint on the paintbrush or roller.
(5) Clean tools immediately after use.
(6) Do not pour diluted paint back into the original packaging.