Instructions
Surface treatment: The wall should be dry, flat, firm and free of oil stains, with a moisture content of less than 10% and a pH value of less than 10; the putty should be strong, water-resistant and crack-resistant.
New cement wall
(1). New concrete needs 30 days to dry.
(2). Remove loose materials and crystallized salts.
(3). Fill cracks and holes with appropriate fillers.
(4). Apply one coat of optimized series primer.
Powdered surface
(1). Remove powder with a high-pressure water gun.
(2). Apply one coat of optimized series primer.
Moldy surface
(1). High-pressure water jet washing
(2). Dilute household bleach at a ratio of 1:10 and wash the wall. Wait for 24-48 hours to dry thoroughly, then rinse with clean water. After the surface is dry, apply a coat of optimized series primer.
Technical Parameters
Ingredients: Acrylic copolymer, composite anti-fungal agent, additives, and water.
Gloss: Matt to glossy (depending on color).
Theoretical Coverage: 7-8 m2/kg (one coat, based on a dry film thickness of approximately 35 μm).
Drying Time: Touch dry: 1 hour (at 23°C and 50% relative humidity).
Hard dry: 4 hours (at 23°C and 50% relative humidity).
Recoat time: 24 hours (at 23°C and 50% relative humidity).
Water washability: Good.
Volume solids: Approximately 38.5% (depending on color).
Specific gravity: Approximately 1.4.
Durability: Excellent.
Construction Instructions
(1) Read the instructions before use.
(2) Stir the can after opening it.
(3) Add the appropriate amount of water according to the instructions. Do not over-dilute and stir well.
(4) Avoid getting too much paint on the paintbrush or roller.
(5) Do not pour diluted paint back into the original packaging.